About Gansu Jingyuan Coal Industry And Electricity Power Co.Ltd(000552)
Reorganization inquiry letter
Inquiry letter on permitted restructuring [2022] No. 7 Gansu Jingyuan Coal Industry And Electricity Power Co.Ltd(000552) board of directors:
On April 25, 2022, according to the plan for issuing shares to purchase assets and raising supporting funds and related party transactions disclosed by your company, the company plans to purchase 100% equity of Yaojie Coal Power Group Co., Ltd. (hereinafter referred to as "target assets") by issuing shares. Some of the built projects of the target assets involve "high energy consumption and high emission" industries, but do not belong to the "two high" projects constructed in violation of regulations, The raised investment project hongshaliang open pit mine project is not a "high energy consumption and high emission" project. In this regard, please verify and explain the following matters:
1. Whether the underlying assets comply with the relevant national or local policy requirements and implementation, whether it is necessary to perform the procedures and performance of approval, approval and filing of relevant competent departments.
2. Whether the production and operation of the underlying assets comply with the national industrial policies, whether they are included in the corresponding industrial planning layout, whether they belong to the restricted and eliminated industries in the Guiding Catalogue for industrial structure adjustment (2019 version), whether they belong to backward production capacity, and if so, whether the requirements for production capacity elimination and replacement have been implemented.
3. Whether the built, under construction and proposed projects of the subject assets meet the dual control requirements of energy consumption in the project location, whether the review opinions on energy conservation of fixed asset investment projects are obtained as required, the main energy consumption and whether they meet the regulatory requirements of the local competent department of energy conservation. 4. Whether the target asset project meets the requirements of the environmental impact assessment document, whether the total pollutant reduction and substitution requirements are implemented, whether the product design energy efficiency level has reached the advanced value of the standard energy consumption limit or the international advanced level, and whether the projects under construction and proposed to be built have obtained the environmental impact assessment Reply of the ecological environment department at the corresponding level.
5. Whether the underlying asset project involves new self owned coal-fired power plants, whether it meets the requirements of the guiding opinions on strengthening and standardizing the supervision and management of self owned coal-fired power plants, whether the built, under construction and proposed projects have coal consumption projects in key areas in air pollution prevention and control, if so, whether the coal equivalent or reduction substitution requirements that should be fulfilled have been fulfilled, and the coal substitution measures have been disclosed.
6. Whether the subject assets have been subject to administrative punishment in the field of environmental protection in the past 36 months, whether they constitute major violations, whether the rectification measures and after rectification comply with the provisions of environmental protection laws and regulations, whether there are environmental protection accidents or major mass environmental events, and whether there are negative media reports on environmental protection.
Please make a written statement on the above issues, and disclose the relevant explanatory materials to the public and submit them to our department before May 11, 2022.
We are writing to inform you that
Shenzhen Stock Exchange
Listed company management department I
May 1, 2022