Guangdong No.2 Hydropower Engineering Company Ltd(002060)
Announcement on providing guarantee for Bachu County Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd. the company and all members of the board of directors guarantee that the information disclosed is true, accurate and complete without false records, misleading statements or major omissions.
Special risk tips:
The external guarantees of the company and its holding subsidiaries are guarantees for the holding (wholly-owned) subsidiaries (grandchildren) within the scope of the consolidated statements. The total amount of external guarantee of the company and its holding subsidiaries exceeds 100% of the latest audited net assets and the guarantee amount exceeds 50% of the latest audited net assets of the company. Please pay attention to the relevant risks. In order to promote the investment and construction of the 150 MW optical storage integration project in Bachu County, Xinjiang, and strive for the project to be put into operation as soon as possible, Guangdong No.2 Hydropower Engineering Company Ltd(002060) (hereinafter referred to as "the company") intends to provide a construction period guarantee for the wholly-owned subsidiary of Xinjiang Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd. (hereinafter referred to as "Xinjiang Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd.") of Bachu County Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd. (hereinafter referred to as "Bachu energy company") with a loan of no more than 582101800 yuan from financial institutions.
1、 Overview of guarantee
The company is invested by Bachu energy company in Bachu County, Kashgar, Xinjiang to build a 150 MW light storage integration project in Bachu County, Xinjiang. The construction scale of the photovoltaic power station of the project is 150mwp and the construction scale of the supporting energy storage project is 22.5mw/45mwh. The total investment of the project is 7311018 million yuan. In order to promote the investment and construction of the project, Bachu energy company plans to apply to financial institutions for a loan of no more than 5820118 million yuan. The company plans to provide construction guarantee for the financing of the project for a period of no more than 6 months (from the date of loan processing, the actual period shall be subject to the contract), and adopt the method of joint liability guarantee. At the same time, the pledge guarantee of electricity charge right is adopted during the operation period of the project.
On March 29, 2022, the 24th Meeting of the 7th board of directors held by the company deliberated and adopted the proposal on providing guarantee for Bachu County Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd. with 9 affirmative votes, 0 negative votes and 0 abstention. It agreed that the company would provide the above guarantee for Bachu Energy Co., Ltd. and the guarantee could be implemented only after being submitted to the general meeting of shareholders for deliberation and approval.
2、 Basic information of the guaranteed
1. Name: Bachu County Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd.
2. Address: poverty alleviation industrial Incubation Park, Yintai Road Industrial Park, Bachu Town, Bachu County, Kashgar, Xinjiang.
3. Type: limited liability company (sole proprietorship of legal person invested or controlled by non natural person).
4. Date of establishment: July 20, 2020.
5. Legal representative: Gao Biao.
6. Registered capital: 15.31 million yuan.
7. Business scope: wind power generation, Cecep Solar Energy Co.Ltd(000591) photovoltaic power generation, water resources investment and development, etc.
8. Property right and control relationship of Bachu energy company.
9. Bachu Energy Co., Ltd. is not a dishonest person.
10. Another financial index of Bachu energy company in the latest year.
Unit: 10000 yuan
Project December 31, 2020 December 31, 2021 (audited) (audited)
Total assets 6988472352682
Total bank loans - 517782
Total current liabilities 5544471674941
Total amount of contingencies (including guarantee, mortgage, litigation and arbitration matters)
Net assets 144400165165
Operating income - 796.66
Total profit - 102.43
Net profit - 102.43
Latest credit rating --
3、 Main contents of the guarantee agreement
1. Guarantee amount: no more than 582101800 yuan.
2. Guarantee method: joint and several liability guarantee.
3. Guarantee period: no more than 6 months.
4. Signing of guarantee agreement: it will be signed after the guarantee is considered and approved by the general meeting of shareholders of the company.
4、 Opinions of the board of directors
1. In order to ensure the smooth development of Bachu energy company's business and promote the construction of 150 MW light storage integration project in Bachu County, Xinjiang, the board of directors agreed that the company would provide construction period guarantee for the loan of Bachu energy company to financial institutions not exceeding 582101800 yuan.
2. The board of directors of the company believes that Bachu energy company has excellent asset quality, good operation, ability to repay debts, broad prospects for clean energy power generation, and controllable risk of this guarantee.
3. Bachu Energy Co., Ltd. is a wholly-owned subsidiary of Xinjiang Guangdong No.2 Hydropower Engineering Company Ltd(002060) and does not provide counter guarantee.
5、 Accumulated external guarantees and overdue guarantees
After this guarantee, the total guarantee amount of the company and its holding subsidiaries is 12542665600 yuan (including the guarantee amount under consideration). After this guarantee is provided, the total external guarantee balance of the company and its holding subsidiaries is 5867658900 yuan, accounting for 149.48% of the company's latest audited net assets; The company and its holding subsidiaries have not provided guarantees for units outside the consolidated statements, guarantees corresponding to overdue debts, guarantees involving litigation and guarantees that should be borne due to the judgment of losing the lawsuit, etc.
6、 Documents for future reference
Resolution of the 24th Meeting of the 7th board of directors.
It is hereby announced.
Guangdong No.2 Hydropower Engineering Company Ltd(002060) board of directors March 30, 2022