Guangdong No.2 Hydropower Engineering Company Ltd(002060)
Announcement on providing guarantee for Suixi Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd. the company and all members of the board of directors guarantee that the information disclosed is true, accurate and complete without false records, misleading statements or major omissions.
Special risk tips:
The external guarantees of the company and its holding subsidiaries are guarantees for the holding (wholly-owned) subsidiaries (grandchildren) within the scope of the consolidated statements. The total amount of external guarantee of the company and its holding subsidiaries exceeds 100% of the latest audited net assets and the guarantee amount exceeds 50% of the latest audited net assets of the company. Please pay attention to the relevant risks. In order to promote the investment and construction of phase II 50mwp photovoltaic power generation project of guantian reservoir in Suixi County, Guangdong Province, and strive for the project to be put into operation as soon as possible, Guangdong No.2 Hydropower Engineering Company Ltd(002060) (hereinafter referred to as “the company”) intends to provide construction period guarantee for Suixi County Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd. (hereinafter referred to as “Suixi energy company”) which is a wholly-owned subsidiary of southeast Guangdong No.2 Hydropower Engineering Company Ltd(002060) ) Investment Co., Ltd. (hereinafter referred to as “southeast Guangdong No.2 Hydropower Engineering Company Ltd(002060) Investment Co., Ltd. (hereinafter referred to as” Suixi energy company “) with a loan of no more than 18104056 million yuan.
1、 Overview of guarantee
Suixi energy company plans to invest in the construction of phase II 50mwp photovoltaic power generation project of guantian reservoir in Suixi County, Guangdong Province, equipped with a set of 5MW / 5mwh energy storage system, with a total investment of 228442300 yuan. In order to promote the investment and construction of the project, Suixi energy company plans to apply to financial institutions for a loan of no more than 18104056 million yuan. The company plans to provide construction guarantee for the financing of the project for a period of no more than 6 months (from the date of loan processing, the actual period shall be subject to the contract), and adopt the form of joint and several liability guarantee. At the same time, the pledge guarantee of electricity charge right is adopted during the operation period of the project.
On March 29, 2022, the 24th Meeting of the 7th board of directors held by the company deliberated and adopted the proposal on providing guarantee for Suixi County Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd. with 9 affirmative votes, 0 negative votes and 0 abstention. It agreed that the company would provide the above guarantee for Suixi Energy Co., Ltd. and the guarantee could be implemented only after being submitted to the general meeting of shareholders for deliberation and approval.
2、 Basic information of the guaranteed
1. Name: Suixi Guangdong No.2 Hydropower Engineering Company Ltd(002060) Energy Co., Ltd.
2. Address: 5th floor, No. 31 zhanchuan Road, Suicheng Town, Suixi County.
3. Type: limited liability company (sole proprietorship of legal person invested or controlled by non natural person).
4. Date of establishment: September 27, 2016.
5. Legal representative: Yang Jizhou.
6. Registered capital: 38.99 million yuan.
7. Business scope: Cecep Solar Energy Co.Ltd(000591) power generation; Wind power generation; Investment and operation of new energy projects.
8. Property right and control relationship of Suixi energy company.
9. Suixi Energy Co., Ltd. is not a dishonest person.
10. Financial indicators of Suixi energy company in the latest year.
Unit: 10000 yuan
Project December 31, 2020 December 31, 2021 (audited) (audited)
Total assets 1266822006737
Total bank loans – 1274035
Total current liabilities 16.75328405
Total amount of contingencies (including guarantee, mortgage, litigation and arbitration matters)
Net assets 789.94410967
Operating income – 134592
Total profit 0.01 205.65
Net profit 0.01 205.65
Latest credit rating —
3、 Main contents of the guarantee agreement
1. Guarantee amount: no more than 18104056 million yuan.
2. Guarantee method: joint and several liability guarantee.
3. Guarantee period: no more than 6 months.
4. Signing of guarantee agreement: it will be signed after the guarantee is considered and approved by the general meeting of shareholders of the company.
4、 Opinions of the board of directors
1. In order to ensure the smooth development of Suixi energy company’s business and promote the construction of phase II 50mwp photovoltaic power generation project of guantian reservoir in Suixi County, Guangdong Province, the board of directors agreed that the company would provide construction period guarantee for Suixi energy company’s loan of no more than 18104056 million yuan from financial institutions.
2. The board of directors of the company believes that Suixi energy company has excellent asset quality, good operation, ability to repay debts, broad prospects for clean energy power generation, and controllable risk of this guarantee.
3. Suixi Energy Co., Ltd. is a wholly-owned subsidiary of southeast Guangdong No.2 Hydropower Engineering Company Ltd(002060) of the company and does not provide counter guarantee.
5、 Accumulated external guarantees and overdue guarantees
After this guarantee, the total guarantee amount of the company and its holding subsidiaries is 12542665600 yuan (including the guarantee amount under consideration). After this guarantee is provided, the total external guarantee balance of the company and its holding subsidiaries is 5867658900 yuan, accounting for 149.48% of the company’s latest audited net assets; The company and its holding subsidiaries have not provided guarantees for units outside the consolidated statements, guarantees corresponding to overdue debts, guarantees involving litigation and guarantees that should be borne due to the judgment of losing the lawsuit, etc.
6、 Documents for future reference
Resolution of the 24th Meeting of the 7th board of directors.
It is hereby announced.
Guangdong No.2 Hydropower Engineering Company Ltd(002060) board of directors March 30, 2022