Securities code: 002060 securities abbreviation: Guangdong No.2 Hydropower Engineering Company Ltd(002060) Announcement No.: pro 2022-011
Guangdong No.2 Hydropower Engineering Company Ltd(002060)
About winning the bid in Xinjiang Aksu region in 2021
Announcement of the second batch of photovoltaic power generation projects (bid section I of Wushi county)
The company and all members of the board of directors guarantee that the information disclosed is true, accurate and complete without false records, misleading statements or major omissions.
On February 17, 2022, Guangdong No.2 Hydropower Engineering Company Ltd(002060) (hereinafter referred to as “the company”) received the letter of acceptance from Aksu development and Reform Commission of Xinjiang Uygur Autonomous Region, The letter of acceptance confirms that the company is the bid winner of the second batch of photovoltaic power generation projects in Aksu Prefecture, Xinjiang Uygur Autonomous Region in 2021 (bid section I of Wushi county) (Project No.: 2021-xjzyxm-008). According to the bidding documents, the installed capacity of the project is 100000 kW. The photovoltaic power generation project in each bid section is configured with an energy storage scale of not less than 15% of the installed capacity, and the energy storage duration at rated power is not less than 3 hours. The company will do a good job in the feasibility study of the project, carry out investment and construction after fulfilling the company’s approval procedures, and fulfill the corresponding information disclosure obligations.
It is hereby announced.
Guangdong No.2 Hydropower Engineering Company Ltd(002060) board of directors
February 18, 2022