Shenzhen Das Intellitech Co.Ltd(002421) : Announcement on winning the bid of Intelligent Transportation Project

Securities code: 002421 securities abbreviation: Shenzhen Das Intellitech Co.Ltd(002421) Announcement No.: 2022-003 Shenzhen Das Intellitech Co.Ltd(002421)

Announcement on winning the smart transportation project

The company and all members of the board of directors guarantee that the information disclosed is true, accurate and complete without false records, misleading statements or major omissions.

Shenzhen Das Intellitech Co.Ltd(002421) (hereinafter referred to as ” Shenzhen Das Intellitech Co.Ltd(002421) ” or “the company”) recently received the letter of acceptance issued by the tenderee, Hong Kong Railway, China Railway electrochemical rail transit (Shenzhen) Co., Ltd. and Guangdong YUENENG Engineering Management Co., Ltd., and won the bid for the comprehensive monitoring project of Shenzhen Urban Rail Transit Line 13, with a bid winning amount of about 113 million yuan. The basic information of the project is as follows:

1、 Basic information of the project

1. Project overview: phase I of Shenzhen rail transit line 13 starts from Shenzhen Bay Port in the South and ends at Gongming North Station on the south side of Longda expressway. It is a municipal express connecting Shenzhen Bay Port and Gongming. It covers the north-south traffic demand corridor in the central by west area and extends the reserved conditions to Songshan Lake in the north.

2. Bid winning amount: 113115260 yuan.

3. Project content: Shenzhen Das Intellitech Co.Ltd(002421) will provide an aiot intelligent management and control platform independently developed for Shenzhen rail transit line 13, including industrial control cloud line access system, big data and smart station, integrated monitoring system (including EMCS, PSCADA and energy management), MCC system, depot intelligent system and related services.

2、 Counterparty information

1. Company Name: MTR China Railway electrochemical rail transit (Shenzhen) Co., Ltd

2. Legal representative: Liu Tiancheng

3. Registered capital: 1720 million yuan

4. Main business: construction, design, operation, development and comprehensive utilization of rail transit projects

5. Address: 314, building A2, building A1A2, Guangming Science Park, China Merchants Group, sightseeing Road, Fenghuang community, Fenghuang street, Guangming District, Shenzhen

6. The company, the controlling shareholder and the actual controller have no relationship with the above counterparties, and the counterparties are in good credit condition, without risks in performance ability, credit status and payment ability. 3、 Impact on Listed Companies

Independent innovation: Based on the passenger service orientation, the project adopts the integrated Internet of things management and control platform for intelligent operation and maintenance and intelligent dispatching independently developed by Shenzhen Das Intellitech Co.Ltd(002421) , based on the application of 5g / WiFi, cloud computing, big data, industrial Internet of things platform and other platforms in the field of rail transit, combined with BIM + GIS 3D map visualization, digital twin and other technologies The standardized and service-oriented design concept provides user-defined scene and plan processing functions to meet the functional requirements of automatic driving scene linkage.

Based on the cloud infrastructure and the application of smart data, NOCC will build a platform for the integration of energy-saving infrastructure and information system of all things, and build a platform for the integration of cloud infrastructure and smart data application system, Realize the management objectives of smart station; The energy management system collects energy consumption data, deeply excavates, analyzes and evaluates them, finds energy consumption problems and energy-saving direction in time, formulates energy-saving rectification measures, and calculates the energy-saving effect and investment return cycle through the system.

In depth cooperation: since the completion of the signal reconstruction project of Hong Kong Chaiwan depot in 1999, Shenzhen Das Intellitech Co.Ltd(002421) has maintained close cooperation with MTR for a long time. This project is another cooperation between the two sides after the reconstruction of the integrated monitoring platform of Shenzhen Metro Line 4 phase I and phase II and the integrated monitoring system of phase III new line project built by MTR, It fully reflects the owner’s recognition of Shenzhen Das Intellitech Co.Ltd(002421) ‘s comprehensive strength and service level in the field of rail transit.

Future impact. The bid winning amount of the project is 113115260 yuan, accounting for 3.52% of the audited operating revenue of the company in 2020. After the formal signing and implementation of the contract, it is expected to have a positive impact on the net profit of the company in the future years, but it has no significant impact on the independence of the company’s business.

4、 Risk tips

Although the company has obtained the letter of acceptance, it has not signed a formal contract, and there are still uncertainties in the signing and terms of the contract. The specific details shall be subject to the final signed contract. The company will pay close attention to the progress of the project and fulfill the obligation of information disclosure in time. Please pay attention to the investment risks.

It is hereby announced.

Shenzhen Das Intellitech Co.Ltd(002421) board of directors February 8, 2022

- Advertisment -