At present, the railway department has lifted the speed limit measures for Beijing Guangzhou high-speed railway, Beijing-Shanghai High Speed Railway Co.Ltd(601816) , Beijing Tianjin Intercity and other lines, and the train operation order is gradually restored.
Previously, affected by the continuous snowfall in many places in Beijing, Tianjin and Hebei, in order to ensure the operation safety of passenger trains, the railway department took temporary speed limiting measures for some sections of Beijing Guangzhou high-speed railway, Beijing-Shanghai High Speed Railway Co.Ltd(601816) , Beijing Tianjin Intercity and other lines, resulting in the delayed operation of trains passing through the above lines. The railway department is organizing personnel to carry out equipment inspection, line inspection and other work.