Recently, it was learned from the national development and Reform Commission that the State Council recently approved the "master plan for post disaster recovery and reconstruction of severe rainstorm and flood disasters in Zhengzhou, Henan Province", which made it clear that after one year's efforts, we will basically complete the repair of flood damaged water conservancy projects affecting flood control, the repair and reinforcement of damaged houses, the reconstruction of the original site of self built houses for rural residents, transportation, energy, communication and other infrastructure, education The guarantee capacity of medical and health services has basically recovered to the pre disaster level.
According to the master plan, after three years of efforts, the task of post disaster recovery and reconstruction has been fully completed, the disaster prevention and mitigation capacity of the disaster area has been significantly improved, and the production and living conditions and the level of economic and social development have fully recovered and exceeded the pre disaster level.
The relevant person in charge of the national development and Reform Commission said that the master plan is a programmatic document to guide post disaster recovery and reconstruction. The introduction and implementation of the master plan is conducive to the overall planning of all forces to rebuild a better home as soon as possible, and give full play to the institutional advantages of socialism in concentrating on major events; It is conducive to the overall planning of post disaster recovery and reconstruction and the improvement of disaster prevention and mitigation capacity, and accelerate the improvement of the ability of disaster areas to prevent and respond to natural disasters; It is conducive to restoring the infrastructure function of the disaster area as soon as possible, improving the level of public services and consolidating the foundation of high-quality regional development.
The master plan puts forward the tasks of post disaster recovery and reconstruction from seven aspects: residential housing, infrastructure, urban waterlogging control, public services, industrial recovery and revitalization, ecological environment and emergency management, and defines important time nodes and phased objectives. (Anbei)