On December 29, Shandong Linglong Tyre Co.Ltd(601966) Hubei Linglong phase II project was put into operation and the launching ceremony of phase III project was held in Jingmen.
It is reported that as the fourth production base built by Shandong Linglong Tyre Co.Ltd(601966) in China, Hubei Linglong project has a total investment of 5.4 billion yuan. It is planned to be constructed in three phases. After completion, it can produce 12 million high-performance passenger and light truck radial tires, 2.4 million truck passenger radial tires and 60000 Engineering tires, and realize sales revenue of more than 5 billion yuan in the year of reaching production.
On July 6, 2018, Hubei Linglong project was launched. Taking green intelligent manufacturing, product life cycle management and industrial big data application as the construction standards, the project has successively completed phase I and phase II projects in more than three years. At the same time, Shandong Linglong Tyre Co.Ltd(601966) started the phase III project when phase II was put into operation, and planned to build the bead steel wire project with an annual output of 100000 tons. The investment of phase III and steel wire project is close to 1 billion, so as to further optimize the layout of Hubei Linglong Industrial structure.
It is understood that Hubei Linglong project is a model for Shandong Linglong Tyre Co.Ltd(601966) to strive to build an intelligent factory. The project was rated as the pilot demonstration project of Intelligent Manufacturing in Hubei Province in 2020 and supported by provincial special funds. Through intelligent manufacturing, Shandong Linglong Tyre Co.Ltd(601966) continuously improve tire production efficiency, production management level and product quality consistency, build a green, environmental friendly, automatic, digital and intelligent world-class factory, and then improve the overall competitiveness of the company.
Shandong Linglong Tyre Co.Ltd(601966) said that the company has always attached great importance to its own intelligent development and adopted intelligent chip technology, visual inspection technology and intelligent production equipment for all-round integration and improvement. Through the application of industrial big data technical means for analysis, comprehensively run through the information collection, sharing, analysis and decision-making of tire design, production, management, logistics and marketing, build a tire intelligent manufacturing system driven by big data and AI, and orderly promote the construction of intelligent factory.
Since this year, Shandong Linglong Tyre Co.Ltd(601966) has promoted the counter cyclical layout and launched the "7 + 5" strategy, that is, seven production bases in China and five production bases abroad. It aims to exceed 160 million tire production and sales by 2030, and plans to build China's sixth and seventh production bases in Tongchuan, Shaanxi and Hefei, Anhui. So far, Shandong Linglong Tyre Co.Ltd(601966) China's seven major production bases have been planned.
Overseas, Shandong Linglong Tyre Co.Ltd(601966) 's Thai production base has reached the annual production capacity of 17 million sets of high-performance radial tires. The annual production capacity of Serbia production base is planned to be 13.62 million sets of high-performance radial tires. It is expected to reach the production capacity in 2025. At present, construction is being stepped up. The remaining three production bases will be planned and promoted by stages according to the site selection and local market conditions.
Wang Feng, chairman of Shandong Linglong Tyre Co.Ltd(601966) said that with the completion of the layout of the company's production bases, the company will accelerate the pace of project construction, export higher quality products to the market with green and environmentally friendly automation, digitization and intelligent chemical plants, and then improve the company's overall competitiveness.
(E company)