The annual gas supply of Nanjiang natural gas project for the benefit of the people exceeded 2 billion cubic meters

As of December 23, Petrochina Company Limited(601857) Xinjiang assistance "No. 1 project" - Nanjiang natural gas benefiting the people project has transported 2.02 billion cubic meters of natural gas to the four prefectures of Nanjiang this year, the highest level in history.

"We don't need to burn coal anymore. Our home is clean. Our life is getting better and better!" Alibiti balati, a villager of dauletdie village, Tajik Abati Town, Tajik Autonomous County, Tashkurgan, looked at the beating blue flame and gave a thumbs up.

Alibiti's joy comes from the "blessing" of Tarim Oilfield. Half a month ago, with the successful operation of the gas supply point of valve chamber B5 of the southern Xinjiang natural gas Limin pipe network, 151 farmers and herdsmen and 440 teachers and students in the relocated village used clean and affordable natural gas. From then on, they bid farewell to the history of changing cans of liquefied gas and filling gas in Maigaiti County dozens of kilometers away. Moreover, after replacing liquefied gas with natural gas, each village household will save at least 600-800 yuan per year.

The South Xinjiang natural gas benefiting people project enables the local farmers and herdsmen to truly experience the modern civilized life of ecology, low carbon and environmental protection. In order to facilitate the payment of fees by farmers and herdsmen, the village of dulet Ti also set up a convenient service point to provide services such as payment, pipeline safety inspection and maintenance, and so on. The masses can either pay at the payment point, or pay online through WeChat, Alipay and other platforms.

With the acceleration of the "gasification of Southern Xinjiang" project, Tarim Oilfield has successively put into operation six gas supply points such as C1 and E2 valve chambers of the southern Xinjiang Limin pipe network, so that more than 10 townships and regiments of Aksu region, Kashgar region and the third division of Xinjiang production and Construction Corps have used pipeline natural gas. Since then, the history of natural gas transportation by tank cars has ended and a new chapter of Comprehensive Rural Revitalization has been opened.

(Xinjiang Daily)

 

- Advertisment -