China Railway Prefabricated Construction Co.Ltd(300374) : the integrated houses produced by the company have been continuously used in the construction of shelter hospitals and temporary testing points in Beijing and other places

China Railway Prefabricated Construction Co.Ltd(300374) at the performance presentation meeting, it was said that since 2020, all industries in the world have been affected to varying degrees, and the operation of the company has also been greatly affected. The integrated houses produced by the company include houses for epidemic prevention and control, which have been continuously used in the construction of shelter hospitals and temporary testing points in Beijing, Xinjiang and other places.

- Advertisment -