"What you can see now is our (construction site), with a total area of 5500 mu, a total investment of 32 billion yuan, and more than 3 billion yuan in this project." Standing on the headquarters platform of Contemporary Amperex Technology Co.Limited(300750) Bangpu integrated new energy industry project, Bai Jianwei introduced to the reporter in high spirits.
Bai Jianwei is the person in charge of the construction site of this super large project and has been sticking to the site throughout the Spring Festival.
Starting from Yichang City, you can reach tianjiahe, Baiyang Industrial Park, Yichang high tech Zone in about an hour. The Contemporary Amperex Technology Co.Limited(300750) Bangpu integrated new energy industry project is located here. After two routine inspections of epidemic prevention and control, the reporter arrived at the construction site.
On the construction site beyond sight, the dynamic rammer is roaring, the excavator is waving its huge arm, and the transport vehicles shuttle back and forth. In the middle of the construction site, the big slogans of "Spring Festival does not stop work and rush forward desperately" and "decisive battle 930 returns Yichang love" glitter in the sun.
"Phase I production on September 30" is the goal and the most urgent task at present.
"We haven't stopped work for a day! More than 300 people are working today. After the sixth day of the lunar new year, the workers will come back. It is estimated that there will be 5000 or 6000 people at the peak in the future." Bai Jianwei said.
According to reports, during the Spring Festival, 11 hammers, 20 dynamic rammers and 24 rotary excavators on the construction site were shut down and rushed to work day and night.
There was no shutdown on the day of the Chinese New Year. In order to express our gratitude, Zeng Yuqun, chairman of Contemporary Amperex Technology Co.Limited(300750) and Li Changdong, chairman of Guangdong Bangpu, paid new year's greetings to everyone via video phone during the new year's Eve dinner on the evening of December 29. The local government also sent big red envelopes, "500 yuan per person. We received more than 160 on the construction site."
The scene has changed dramatically.
"The original mountain of our family has been completely dug out. I can't believe it." On the edge of the construction site, a sister-in-law led her relatives to watch the excitement. In less than half a year, her house and the hill behind the house had disappeared, and the whole village had become a large flat land.
"We want to build the largest enterprise in Yichang!" Facing the envy of relatives that "your family has made a fortune in demolition", the sister-in-law immediately changed the topic.
According to Bai Jianwei, there are about 11 million cubic meters of earthworks on the whole construction site. At present, half of them have been completed, "many small hills have been dug."
Mega projects have also brought a lot of local employment opportunities.
"I took two days off, and some of them didn't take a day off. On New Year's Eve, the first day and the second day of the new year, the salary was high, and there were 1000 yuan a day." Lao Gu, who is helping build a plank house, told reporters.
Lao Gu is a farmer in gujiadian nearby. His family is about 10 kilometers away from the construction site. He rides a motorcycle to work with his companions every day. "As long as he is willing to do things, he has more work to do."
In the project department, the reporter met several people who came to look for a job. "I'm an electrician. I used to work in Wuhan. Come and have a look. It's closer to home." A 30-year-old youth told reporters.
There are some more distant guests, aiming at bigger business. In the parking lot next to the project department, the licenses of Shanghai, Guizhou, Guangdong and other places have exposed the departure places of the guests. Everyone has the same purpose: to complete this super large project together
at 9:40 a.m. on February 5, when the reporter arrived at the construction site, more than 20 people had visited
According to public information, Contemporary Amperex Technology Co.Limited(300750) Bangpu integrated new energy industry project is the largest investment attraction project in Yichang's history, with a planned capacity of 360000 tons of iron phosphate, 220000 tons of lithium iron phosphate, 180000 tons of ternary precursors and materials, 40000 tons of lithium cobalt, 40000 tons of recycled graphite and 300000 tons of battery recycling.
The first phase of the project is expected to be put into operation in 2023. After it is fully put into operation by the end of 2025, it can provide cathode materials for the battery production of more than 3 million new energy vehicles, with an estimated annual output value of 40 billion yuan and more than 10000 jobs.